50-STATE LOW VOC · ASTM TESTED · PART A + PART B PRO KITSCOLOR-CODED PHYSICAL LABEL SYSTEM:PART A · RESINPART B · HARDENERZERO-ERROR STOICHIOMETRY · BATCH ASTM TDS & 16-SEC OSHA SDSCHEMTREC: 1-800-424-9300(346) 281-71321714 W 23rd St Houston Pickup →
SKU MVB-49-100
MVB 49MOISTURE VAPOR BARRIER EPOXY | SUPPRESSES UP TO 25 LBS MVER
PART A · RESINPART B · HARDENERMIX 2:1 BY VOLUME
CRITICALCRITICAL ALERT: POT LIFE 20–30 MINUTES | SUPPRESSES UP TO 25 LBS MVER / 99% RH50-STATE LOW VOC · HOUSTON, TX
MVER LIMITUP TO 25 LBS MVER
RH TOLERANCE99% IN-SITU RH
PERMEANCE<0.10 PERMS (CLASS I)
ALKALINITYRESISTANT TO PH 14

DIRECT FACTORY DISPATCH · SKU MVB-49-100 · 2:1 BY VOLUME

MVB 49 — Moisture Vapor Barrier (3-Gal Kit)

$199 – $895Batch-matched TDS included · Freight quoted at checkout

KIT SIZE & YIELD3-Gal Split Bucket Kit (2A:1B)Covers ~360 sq ft / kit
CONTAINER FORMAT1-Gal Split Buckets (8.75"×5") & 5-Gal PailsUN-rated jobsite packaging
KIT CONTENTS2 Gal Part A (Resin) + 1 Gal Part B (Hardener)Pre-proportioned factory fill
MIX RATIO (A : B)2:1 BY VOLUME (2 PARTS A : 1 PART B)350 RPM spiral paddle · 2–3 min
Kit Size
In Stock — Houston 77008 (11 Kits)

High-performance moisture vapor barrier epoxy controlling moisture emission rates up to 25 lbs / 1,000 sq ft / 24 hrs.

VISUAL ENGINEERING BREAKDOWN · 2000×2000 HIGH-CONTRAST PLATES

Stoichiometry, Film Build, ASTM Lab Proof & 5-Stage Slab Architecture

Calculate Exact Gallon Take-Off →
PT02 · STOICHIOMETRY

2A:1B vs. 1A:1B Mix Ratio & 350 RPM Discipline

Exact Part A resin & Part B hardener stoichiometry, 3-minute submerged helical mix, and immediate ribbon dump rule.

PT03 · FILM BUILD

32–40 Mil 100% Solids vs. 2–3 Mil Water-Based Paint

Zero evaporation shrinkage vs. 50% carrier loss in box-store garage kits that peel under hot tires.

PT04 · ASTM LAB PROOF

11,500+ PSI Compressive & 25 lbs MVER Defense

Verified ASTM D695 compressive load, Shore D 82–85 hardness, Taber <25 mg wear, and 2,000+ hr QUV non-yellowing.

PT05 · 5-STAGE ARCHITECTURE

Cross-Section Slab Cutaway (CSP 2–3 to Polyaspartic)

Monolithic bond from diamond-ground concrete through Primer/MVB 49, Epoxy 49 + Mica/Flake, and Polyaspartic 49.

1080P FIELD APPLICATION & CURED FINISH

Live Pour & Showroom Performance

Test Colors in 3D Visualizer →
MVB 49 · LIVE APPLICATION

MVB 49 Jobsite Mixing & Pour Execution

MOISTURE VAPOR BARRIER EPOXY | SUPPRESSES UP TO 25 LBS MVER

CURED COMMERCIAL FINISH

3-Car Showroom Mirror-Gloss Floor

Shore D 82–85 cured armor rated >11,500 psi compressive strength and hot-tire immune to 140°F.

OFFICIAL CONTAINER LABEL SPECIFICATION · MVB-49-100

MVB 49 — ASTM DATA, MIXING SOP & OSHA GHS COMPLIANCE

PART A · RESINPART B · HARDENER
PHYSICAL PROPERTIES (ASTM)LAB CURED @ 72°F
Solids Content100% (ASTM D2697)
Mix Ratio (A:B)2:1 by Volume
MVER Limit25 lbs / 1,000 sq ft
Internal HumidityUp to 99% RH (F2170)
Permeance Rating<0.10 Perms (E96)
pH ResistanceResists pH 14 Slabs
Shore D Hardness84 – 86 D (D2240)
Tensile Strength8,200 psi (D638)
Compressive Strength12,000 psi (D695)
Tensile Adhesion>450 psi (Slab Fail)
Mixed Viscosity1,200 – 1,500 cps
VOC Content<10 g/L (EPA 24)
Pot Life (72°F Mass)20 – 30 Minutes
Recoat Window8 – 16 Hours @ 72°F
APPLICATION & MIXING PROTOCOLCONTRACTOR SOP
  1. 01Mechanical Prep: Shot blast or diamond grind concrete to ICRI CSP 3. Vacuum dust completely.
  2. 02Pre-Mix: Separately stir Part A for 1 minute. Accurately measure 2 Parts A to 1 Part B by volume.
  3. 03Mechanical Mix: Blend 3 minutes with low-speed drill (350 RPM). Scrape bucket walls and bottom.
  4. 04Immediate Placement: Empty contents immediately onto slab in ribbons (exotherm risk in bucket).
  5. 05High Moisture App: Spread with 3/16" or 1/4" V-notched squeegee at 100-120 sq ft/gal (14–16 wet mils).
  6. 06Moderate Moisture App: Spread at 130-150 sq ft/gal (11–12 wet mils) for slabs up to 15 lbs MVER.
  7. 07Back-Rolling: Immediately cross-roll with 3/8" nap lint-free roller perpendicular to squeegee pulls.
  8. 08Pinhole Inspection: Inspect cured film for outgassing pinholes. A continuous monolithic film is mandatory.
  9. 09Recoat Window: 8 to 16 hours. Apply base coat within this window without mechanical abrading.
  10. 10Abrasion Window: If recoat window exceeds 24 hours, abrade with 60-80 grit sanding screen.
OSHA GHS CLASSIFICATIONDANGER
CORROSIVE
IRRITANT
HEALTH HAZARD
AQUATIC
  • H314: Causes severe skin burns and serious eye damage.
  • H317: May cause an allergic skin reaction.
  • H373: May cause organ damage through prolonged exposure.
  • H411: Toxic to aquatic life with long lasting effects.
MANDATORY APPLICATOR PPE
Nitrile Gloves8+ mil chemical resistant
Splash GogglesANSI Z87.1 eye protection
OV RespiratorNIOSH organic vapor cartridge
Spiked FootwearLong sleeves & 3/4" spikes
Download 16-Section OSHA GHS Safety Data Sheet (PDF) ↓
24-HR CHEMTREC EMERGENCY:1-800-424-9300