5-STAGE COMMERCIAL INSTALLATION SCOPE OF WORK
- 01
Stage 1 — Mechanical Diamond Grinding (ICRI CSP 2–3 Profile): Planetary diamond grinding of the entire concrete substrate to remove laitance, curing compounds, and contaminants per ICRI Guideline No. 310.2R, followed by HEPA vacuum extraction and crack/joint detailing.
- 02
Stage 2 — Capillary Primer / Hydrostatic Vapor Remediation: Application of PRIMER 49™ Deep-Penetrating Epoxy Primer (<3 lbs MVER · 2A:1B) to lock down concrete pores and prevent outgassing pinholes or osmotic delamination.
- 03
Stage 3 — 100% Solids High-Build Structural Body Coat (ASTM D2697): Application of EPOXY 49™ 100% Solids Cycloaliphatic Resin (2A:1B) — zero water or cheap solvent fillers, >11,500 psi compressive strength (ASTM D695), and >450 psi concrete adhesion.
- 04
Stage 4 — Architectural Finish (3D Metallic Marble — Onyx Black): Precision dispersion of UV-resistant architectural metallic mica pigments or commercial broadcast media for a monolithic, chemical-resistant floor.
- 05
Stage 5 — Aliphatic UV & Hot-Tire Armor Topcoat (POLYASPARTIC 49™): Cross-rolled application of 98–99% solids POLYASPARTIC 49™ (1A:1B) topcoat — <25 mg Taber abrasion, zero UV yellowing, 140°F hot-tire defense, and 24–48 hour return to service.
TURNKEY INSTALLED PROJECT INVESTMENT (MATERIALS + LABOR + DIAMOND PREP)Includes mechanical diamond grinding, moisture barrier/primer, 100% solids build coat, architectural finish media, and aliphatic polyaspartic UV armor topcoat. Payment Schedule: 50% Deposit ($1,913) upon scheduling · 50% Balance ($1,912) upon completion walk-through.
$8.50 / sq ft installed$3,825
10-YEAR RESIDENTIAL / 5-YEAR COMMERCIAL LIMITED COATING WARRANTY: Warranted against peeling, delamination, blistering, hot-tire pickup, or UV yellowing when installed over ICRI CSP 2–3 mechanically profiled concrete with verified ASTM F2170/F1869 moisture remediation. Excludes structural slab cracking/heaving, unmitigated hydrostatic pressure (>25 lbs MVER), or metal-studded tires.
Property Owner Acceptance Signature & Date Authorized Installing Contractor Signature & Date